Skip to content

The desk is open 7am–10pm ET, seven days a week

1,000 U.S. cities46 services

The Pro Near Me A local call desk for the house you live in.
Call the desk(877) 454-8068

7am–10pm ET, seven days a week

Service index 20 · Structure & Remodel

Remodeling & Additions help, without the runaround.

An addition asks more of a house than a remodel does. It changes how the structure carries weight, how water drains, and how the house meets the weather. The early questions matter more than the finishes: what can be built, where, and under what rules.

A remodeling project usually begins with a sentence about space: a kitchen that needs another few feet, an office with a door, a bathroom on the first floor, a second story that could hold two more rooms. Turning that sentence into a buildable plan takes a survey of the lot, a look at the structure, and a clear-eyed talk about permits and money. The first call is where that gets sorted.

Call now

  • A wall, ceiling, or floor has visibly moved, cracked, or sagged.
  • Water is coming through an open roof or a cut exterior wall.
  • You smell gas or see burning at a panel or temporary service.

Can usually wait

  • You are still deciding between an addition, a reconfiguration, or a move.
  • Plans exist but the budget and the scope have not been reconciled.
  • Finish choices remain, but the shell is closed and dry.

Have this ready

  • A survey or plot plan, if you have one.
  • Photos of the house from all four sides and of the area to change.
  • Your list of goals, your rough budget range, and your decision-makers.

What the desk hears most

  1. 01

    An addition that has to fit the lot

    Setbacks, easements, slope, trees, and the path of stormwater decide where a foundation can go before design begins. A survey is not paperwork for later; it is the first drawing. On a tight lot, the shape of the addition follows the buildable area.

  2. 02

    Opening up a first floor

    The wall between a kitchen and a living room may be carrying the floor above. A beam and posts can replace it, but an engineer has to size them and the load path has to continue to the foundation. This is not a handyman project.

  3. 03

    A second story or dormer

    Adding height changes the roof, the stairs, the framing, and sometimes the neighbor's light. The existing foundation may or may not carry the new load. Expect an engineer, a taller budget, and a longer permit review than a one-room remodel.

  4. 04

    A garage or basement conversion

    A garage floor is usually lower and colder than the house, and a basement wall is built to hold soil, not to be a bedroom. Insulation, egress, moisture control, and heating all have to meet a different standard for living space.

  5. 05

    A whole-home reconfiguration

    Moving a staircase, combining two small rooms, or adding a bath changes how every trade sequences work. Phasing matters when people are living in the house. The plan has to say what stays usable and for how long.

Call now or wait?

The honest answer depends on whether the problem is contained and whether the house is safe. Use these two lists as a starting point, then call and describe the specifics.

Call now

  • Structural movementA widening crack, a door that no longer closes, or a floor that bounces differently after a wall comes out needs an engineer before more work. Stop the demo and keep the area clear.
  • Weather opening the houseTarp the opening, move water away from the interior, and call. A house open to rain can lose insulation, drywall, and flooring in a single storm.
  • Gas or electrical hazard during constructionGet everyone out for a gas smell, smoke, or burning at a panel, then call 911 or the utility from a safe distance. A crew should not try to find the source with a lighter or an uncalibrated meter.
  • Work stopped by the building departmentA stop-work order is not a problem to route around. Stop, talk to the inspector, and get the drawings and permits corrected before anyone returns to the site.

Can usually wait

  • Feasibility and budgetingMost projects spend weeks or months in this stage. Use it to test the lot, the structure, and the numbers before hiring a builder.
  • Finish selectionsTile, fixtures, and paint can be chosen after the shell is priced. Deciding them too early can lock in a detail the budget cannot carry.
  • A punch listSmall incomplete items at the end are normal. Keep a written list and walk it with the builder before the final payment.
  • A weather or permit delayFraming in rain or waiting on an inspection is part of construction. Ask how the schedule absorbs the lost days rather than pushing the crew to rush.

Before you dial: the 60-second prep

You do not need a diagnosis. You need enough detail for the desk to route the call and for the pro to arrive with the right questions.

  • Pull out the survey, deed, and any prior permits you have.
  • Walk the property line and note setbacks, easements, and drainage.
  • Photograph the house from four sides and the rooms to be changed.
  • Write the goal in one sentence, then list the must-haves.
  • Set a budget range and a separate contingency.
  • Decide who makes decisions and who will be home during work.

What happens when you call

01

The goal, the lot, and the house

Start with what the space needs to do and what the property allows. The desk will ask about the lot, the existing structure, and whether drawings or a survey already exist.

02

Routing to the right builder

An addition, a structural opening, and a whole-house reconfiguration attract different firms. Your call goes to an independent local remodeler or design-build team that handles that scale of work.

03

Feasibility before finishes

The first meeting should cover buildability, the permit path, and the sequence. Ask what the builder needs from an engineer and what the initial conversation or site visit costs.

What changes the job here

Housing age, weather, water, soil, and foundation type all change how a remodeling & additions problem behaves. These are the local factors worth mentioning on the call.

Frost depth and footings

In cold climates, a foundation has to sit below the frost line or it will move. That depth changes the concrete, the cost, and the schedule. Ask how the footings will be inspected before the pour.

Expansive clay and slope

Soil that swells when wet and shrinks when dry can lift a slab and crack a wall. On sloped lots, drainage and retaining have to be designed with the addition, not added after the first wet season.

Coastal wind, flood, and salt

Near water, uplift ties, elevation rules, and floodplain review can shape the frame before the first board is cut. Salt air also argues for corrosion-resistant fasteners and flashing details that shed water.

Tight urban lots and historic districts

A narrow alley limits concrete trucks and crane reach, and a historic district may review the roofline and windows. Neighbor notice and parking rules can affect the schedule as much as the weather.

Questions worth asking the pro

Ask before you authorize work. A good professional will answer plainly, including the parts that are still uncertain.

  1. Have you built on a lot like this before?
  2. Who is the engineer, and who calls for inspections?
  3. Is the contract fixed-price or cost-plus, and what is excluded?
  4. How do you handle weather and permit delays?
  5. Who is on site each day, and who do I call?
  6. What is the payment schedule tied to?

Related services

Before you call

Remodeling & Additions questions

Short answers to the questions that come up most often. If your situation is not here, call the desk and describe it.

Do I need an architect for an addition?

Not always. Some design-build firms handle drawings in house, and a structural engineer may be the only outside professional needed for a simple bump-out. A larger or unusual project usually benefits from a designer who has solved similar lots.

How long does an addition take?

It depends on the permit review, the weather, the foundation, and the finish schedule. Ask for a sequence with the major phases rather than a single date. A builder who explains the dependencies is more useful than one who promises speed.

Can we live in the house during the work?

Often yes, especially for an addition with a sealed doorway to the main house. Dust, noise, and utility shutoffs are part of it. If the kitchen or only bath is involved, plan the temporary arrangement before demo starts.

What if the contractor finds rot or bad wiring?

The work should stop long enough to document the problem and price the fix. Hidden damage is common in older walls. Ask for photos and a written change before the crew covers it up.

Do I need a permit for an addition?

Almost always, along with inspections at the foundation, framing, and other stages. Decks, electrical, plumbing, and structural changes usually need one too. Unpermitted work can become a problem when you sell, so verify the record.

The desk is open 7am–10pm ET

Need remodeling & additions help?

Tell the desk the city and what is happening. The call is free, and the independent professional sets their own charges.

(877) 454-8068Seven days a week

No forms. No quote maze. Just a local conversation.

Find a city Call the desk(877) 454-8068